How to choose an AI data center site under 50 MW
A practical checklist for evaluating a small-MW AI data center site: power, land, fiber, cooling, permitting and who you are dealing with.
To choose a site under 50 MW, confirm the power first, then check fiber, permitting and land. Everything else can be solved more cheaply than a power problem.
Power
- Is there a written statement of available capacity from the utility?
- Is service firm or interruptible?
- What are the deposit, study cost and timeline?
- Who owns the transformer and substation work?
Fiber
- Who is the operator, and is dark fiber available?
- How far is the splice point, and who pays to reach it?
- Is there a diverse second route?
Land and permitting
- What rights exist today: ownership, option or lease?
- When do those rights expire?
- What local permits apply, and what are the statutory timelines?
- Are there easements or existing leases on the land?
Cooling and climate
- How many hours of free cooling does the climate allow?
- Is water available, or is a closed-loop system planned?
Counterparties
Check who you are dealing with and how much of the site they actually control. A good seller will tell you what is still open.
By Territory Holdings. Last updated October 30, 2026. This is general information, not advice.